
PiuControllo FLAT Casa Gas
Estimated bill
≈ €204.96 / month
Taxes included
Supplier share: €117.88/month, before taxes
Terms valid for 30 months
€2,459.58 / year
At 1,400 Smc/year
Part of the price per unit
Standing charge
Commercial service charge €156
Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use a shared PSV reference of 0.501205 €/Smc (12-month average, 2025-10/2026-09), which may differ from the contract’s index. Monthly spending is the annual estimate divided by 12, not a winter bill.
Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.
Availability & signup
Available only in selected areas. Confirm your supply address with the seller.
Provinces: Venezia, Padova. Municipalities: Agugliaro, Asiago, Asigliano Veneto, Bassano del Grappa, Breganze, Calvene, Camisano Vicentino, Campiglia dei Berici, Cartigliano, Cassola, Enego, Fara Vicentino, Foza, Gallio, Grisignano di Zocco, Grumolo delle Abbadesse, Lugo di Vicenza, Marostica, Montecchio Precalcino, Mussolente, Nove, Noventa Vicentina, Orgiano, Pianezze, Pove del Grappa, Roana, Romano d'Ezzelino, Rosà, Rossano Veneto, Rotzo, Salcedo, Sandrigo, Sarcedo, Schiavon, Solagna, Tezze sul Brenta, Zugliano, Lusiana Conco, Altivole, Castelfranco Veneto, Castello di Godego, Loria, Resana, Riese Pio X, San Zenone degli Ezzelini, Campagna Lupia, Campolongo Maggiore, Camponogara, Fiesso d'Artico, Fossò, Mira, Pianiga, Santa Maria di Sala, Stra, Venezia, Vigonovo, Abano Terme, Arquà Petrarca, Borgoricco, Brugine, Cadoneghe, Campodarsego, Campodoro, Camposampiero, Campo San Martino, Carmignano di Brenta, Cervarese Santa Croce, Cinto Euganeo, Cittadella, Curtarolo, Fontaniva, Galliera Veneta, Galzignano Terme, Gazzo, Grantorto, Legnaro, Limena, Loreggia, Lozzo Atestino, Massanzago, Mestrino, Montegrotto Terme, Noventa Padovana, Padova, Piazzola sul Brenta, Ponte San Nicolò, Rovolon, Rubano, Saccolongo, San Giorgio delle Pertiche, San Giorgio in Bosco, San Martino di Lupari, San Pietro in Gu, Santa Giustina in Colle, Sant'Angelo di Piove di Sacco, Saonara, Selvazzano Dentro, Teolo, Tombolo, Torreglia, Veggiano, Vigodarzere, Vigonza, Villa del Conte, Villafranca Padovana, Villanova di Camposampiero, Vo'.
Check whether your activation or supplier change is eligible.
Confirm local availability, eligibility and activation terms with the seller.
Payment: Bank direct debit, Postal direct debit, Pre-filled payment slip, Other methods
Signup channel: Sales outlet, Phone, Agency
Sign up by Nov 25, 2026; this is not the price expiry date.
Offer terms
Full offer text
Switch to energy with the peace of mind of an energy component price fixed for 30 months! PiùControllo FLAT gives you a fixed price to protect you from possible market increases. Until 31.12.2027, CO2 emissions are offset through the purchase of certified carbon credits.
If the customer does not set up direct debit for bill payments, a security deposit is required under the terms described in Article 4 of the General Contract Conditions, up to a maximum of €300 for natural gas supply and €11.50/kW for electricity supply.
Source & dates
Source accessed on Nov 15, 2026.
Offers current as of Nov 15, 2026.
Offer code: 001155GSFML01XXPCFCG061126000000
Similar offers

Segnoverde
Chiara Fix
Estimated bill
≈ €206.63 / month
Taxes included

Segnoverde
Chiarissima Promo
Estimated bill
≈ €207.40 / month
Taxes included

Estenergy
PiuControllo FLAT Casa Gas
Estimated bill
≈ €204.96 / month
Taxes included

Hera Comm
PiuControllo FLAT Casa Gas
Estimated bill
≈ €204.96 / month
Taxes included

Etra Energia
ETRA Placet Fissa Gas Casa
Estimated bill
≈ €210.76 / month
Taxes included
Estimated bill
≈ €205 / month
Taxes included
