Trasteel X You
Estimated bill
≈ €82.71 / month
Taxes included
Supplier share: €54.75/month, before taxes
Terms valid for 36 months
€992.50 / year
At 2,700 kWh/year
Part of the price per unit
Same price 24/7
Standing charge
Annual fixed fee per supply point, applied in monthly installments, unchanged for 36 months.
Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use the 12-month average of PUN (0.137499 €/kWh, 2025-10/2026-09). Monthly spending is the annual estimate divided by 12.
Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.
Availability & signup
Check availability at your supply address.
Check which residence requirements apply with the seller.
Check whether your activation or supplier change is eligible.
Confirm local availability, eligibility and activation terms with the seller.
Payment: Bank direct debit, Card direct debit, Pre-filled payment slip
Signup channel: Online
Sign up by Nov 30, 2026; this is not the price expiry date.
Offer terms
Full offer text
Fixed-price offer for low-voltage residential customers. The consumption charge is 0,190 euros/kWh, single-rate and the same across all time bands, including network losses, fixed and unchanged for 36 months from the activation date. An additional fixed charge of 144,00 euros/year per POD applies in monthly installments, replacing the sales component. From month 37, the terms renew at a variable price for periods of 12 months: (PUN Index GME + 0,0158 euros/kWh) x 1,10 and a fixed charge of 162,00 euros/POD/year, with written notice at least 3 months before expiry and the right to terminate without charges. Dispatching, network tariffs, and general system charges are applied at the current ARERA rates. If you terminate during the first 36 months, the early termination charge specified in the contractual terms may be due. The offer does not include Guarantees of Origin.
No guarantee is required with SEPA Direct Debit. If a payment method other than SEPA Direct Debit is used, a security deposit of 11,50 euros per kW of contracted capacity (34,50 euros for 3 kW) is required. It is refunded with statutory interest when the contract ends (Art. 6 of the General Supply Conditions).
Source & dates
Source accessed on Nov 15, 2026.
Offers current as of Nov 15, 2026.
Offer code: 040243ESFML01XXTRASTEELXYOU36DOM
Similar offers
Trasteel Energy
Jol Domestica
Estimated bill
≈ €86.01 / month
Taxes included

Yes Energy
Placet per la Tua Casa · Two rates
Estimated bill
≈ €82.34 / month
Taxes included

Martelius
Galattica 2.0.
Estimated bill
≈ €82.96 / month
Taxes included
Estimated bill
≈ €82.03 / month
Taxes included

Union
Fix&Go24 New Luce
Estimated bill
≈ €82.46 / month
Taxes included

Tea Energia
PLACET Fissa Luce (Domestico) · Single rate
Estimated bill
≈ €83.20 / month
Taxes included
