Skip to content
4G Energia

4G Diretto Gas Consumer Casa Index Relax X2

Estimated bill

≈ €179.45 / month

Taxes included

Supplier share: €96.31/month, before taxes

Terms valid for 12 months

Taxes included

Supplier share: €96.31/month, before taxes

€2,153.37 / year

At 1,400 Smc/year

≈ 0.7312 €/Smc using average PSV 0.5012

Markup on the market price

Market +0.23€/Smc

Standing charge

€132/ year (€11.00 / month)

Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use a shared PSV reference of 0.501205 €/Smc (12-month average, 2025-10/2026-09), which may differ from the contract’s index. Monthly spending is the annual estimate divided by 12, not a winter bill.

Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.

Availability & signup

  • Check availability at your supply address.

  • Check whether your activation or supplier change is eligible.

  • Confirm local availability, eligibility and activation terms with the seller.

Payment: Bank direct debit, Postal direct debit, Pre-filled payment slip, Other methods

Signup channel: All channels

Sign up by Jan 31, 2027; this is not the price expiry date.

Terms valid for 12 months

Offer terms

4G DIRETTO GAS CONSUMER CASA INDEX RELAX X2

  • After 4G Energia sends written acceptance of the contract proposal submitted by the Customer, 4G Energia will send written notice of the supply start date. The purpose of the Contract is for 4G Energia to supply natural gas and/or electricity to the Customer’s delivery point(s) (PdR) and/or withdrawal point(s) (PdP), as requested by the Customer, and for 4G Energia to enter into electricity dispatching and transmission contracts with the counterparties designated by the applicable regulations. Performance of the Contract is subject to successful completion of the activation or supplier-switching procedure with the local distributors. As supplier, 4G Energia reserves the right to supply gas and/or electricity under the terms of the applicable sector regulations, provided that: a) Pipelines already exist on the street where the property for which the application is made is located, or the conditions exist for them to be built under the agreement in force between the local Distributor and the Municipality and under Legislative Decree No. 164/2000. In the latter case, the supply may be requested only once the local Distributor has built the pipelines. b) A connection already exists between the building and the local Distributor’s network, or the local Distributor has undertaken to build one. In the latter case, supply will begin only after the Distributor has built the connection and notified 4G Energia accordingly. c) The Customer has paid the connection charges directly to the Supplier, which is authorized to collect them in the name and on behalf of the Distributor. The Customer remains responsible for carrying out, at the Customer’s own expense, all preparatory and related works required to build the connection. If the Customer fails to pay the connection charge, supply cannot begin and the Contract will be expressly and automatically terminated. d) The applicant has obtained express authorization to lay the pipelines for the connection from the property owner and/or the competent public authorities and/or any other private third parties who may hold rights of way or other rights in rem over the property. The applicant agrees to provide this authorization to the Distributor and/or 4G Energia if requested. e) The applicant or the Distributor has submitted all documents certifying that the property is habitable and/or fit for use, as well as any other documents required by applicable law. Failure to meet any of the conditions above will result in express termination of the Contract.

If the customer chooses a payment method other than bank or postal direct debit, 4G Energia will charge a security deposit on the customer’s first bill. The amount will be determined under Article 5(2)(b) of the Integrated Text of the Activities of Sale of Natural Gas and Other Gases Distributed Through Urban Networks, approved by Resolution ARG/gas 64/09 of 28 May 2009, as subsequently amended and supplemented. The security deposit for the supply being closed will be refunded with the final bill, without the customer having to request it, and with statutory interest added, unless all or part of it is retained to settle any unpaid bills and the related late-payment interest.

Annual seller charges

€132 / year

CCV Commercialisation and Sales charge of €132/point/year (€11.00/point/month) set by 4G Energia

Source & dates

Source accessed on Oct 31, 2026.

Offers current as of Nov 1, 2026.

Offer code: 023827GSVML01XX27UF0COTD0REL00X2

Similar offers