Skip to content
Etra Energia

Prezzo Netto Relax Casa GAS

Estimated bill

≈ €156.20 / month

Taxes included

Supplier share: €76.55/month, before taxes

Terms valid for 12 months

Taxes included

Supplier share: €76.55/month, before taxes

€1,874.40 / year

At 1,400 Smc/year

≈ 0.5533 €/Smc using average PSV 0.5012

Markup on the market price

Market +0.0521€/Smc

Standing charge

€144/ year (€12.00 / month)

Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use a shared PSV reference of 0.501205 €/Smc (12-month average, 2025-10/2026-09), which may differ from the contract’s index. Monthly spending is the annual estimate divided by 12, not a winter bill.

Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.

Availability & signup

  • Available only in selected areas. Confirm your supply address with the seller.

  • Provinces: Venezia, Padova. Municipalities: Agugliaro, Asiago, Asigliano Veneto, Bassano del Grappa, Breganze, Calvene, Camisano Vicentino, Campiglia dei Berici, Cartigliano, Cassola, Enego, Fara Vicentino, Foza, Gallio, Grisignano di Zocco, Grumolo delle Abbadesse, Lugo di Vicenza, Marostica, Montecchio Precalcino, Mussolente, Nove, Noventa Vicentina, Orgiano, Pianezze, Pove del Grappa, Roana, Romano d'Ezzelino, Rosà, Rossano Veneto, Rotzo, Salcedo, Sandrigo, Sarcedo, Schiavon, Solagna, Tezze sul Brenta, Zugliano, Lusiana Conco, Altivole, Castelfranco Veneto, Castello di Godego, Loria, Resana, Riese Pio X, San Zenone degli Ezzelini, Campagna Lupia, Campolongo Maggiore, Camponogara, Fiesso d'Artico, Fossò, Mira, Pianiga, Santa Maria di Sala, Stra, Venezia, Vigonovo, Abano Terme, Arquà Petrarca, Borgoricco, Brugine, Cadoneghe, Campodarsego, Campodoro, Camposampiero, Campo San Martino, Carmignano di Brenta, Cervarese Santa Croce, Cinto Euganeo, Cittadella, Curtarolo, Fontaniva, Galliera Veneta, Galzignano Terme, Gazzo, Grantorto, Legnaro, Limena, Loreggia, Lozzo Atestino, Massanzago, Mestrino, Montegrotto Terme, Noventa Padovana, Padova, Piazzola sul Brenta, Ponte San Nicolò, Rovolon, Rubano, Saccolongo, San Giorgio delle Pertiche, San Giorgio in Bosco, San Martino di Lupari, San Pietro in Gu, Santa Giustina in Colle, Sant'Angelo di Piove di Sacco, Saonara, Selvazzano Dentro, Teolo, Tombolo, Torreglia, Veggiano, Vigodarzere, Vigonza, Villa del Conte, Villafranca Padovana, Villanova di Camposampiero, Vo'.

  • Check whether your activation or supplier change is eligible.

  • Annual consumption: 0–100,000,000 Smc. Confirm the applicable limits.

  • Confirm local availability, eligibility and activation terms with the seller.

Payment: Bank direct debit, Postal direct debit, Pre-filled payment slip, Other methods

Signup channel: Phone

Sign up by Nov 4, 2026; this is not the price expiry date.

Terms valid for 12 months

Offer terms

With Prezzo Netto Relax Casa Gas, enjoy the savings of wholesale market pricing with an €80 Bonus Relax! Access the wholesale market and take advantage of benefits previously reserved for only a few operators. The price applied to your consumption to cover the wholesale marketing charge will follow the PSV index, with a small contribution on consumption.

  • Activation of the supply, and therefore the effectiveness of the Contract, is subject to there being no previous payment arrears attributable to the Customer and to a positive assessment of the Customer’s creditworthiness (credit check). The time limits for starting performance of the Contract are as follows: within a maximum of 10 working days for activations without a change of Supplier; within a maximum of 50 days for activations involving a change of Supplier. For the supply points covered by the Contract, the Customer authorizes the Company to enter into the transportation contract with the local Distributor.

If the customer does not set up direct debit for bill payments, a security deposit is required under the terms described in Article 4 of the General Contract Conditions, up to a maximum of €300 for natural gas supply and €11.50/kW for electricity supply.

Annual seller charges

€144 / year

Commercial service charge of €144

Discount conditions

Check each discount’s conditions. Do not deduct it again if it is already included in a price; discounts may not combine.

Bill discount, subject to conditions: €80.00 / year. €80 Bonus

  • €80 BONUS: The bonus will be paid in equal monthly instalments for the first 12 months of supply.

Source & dates

Source accessed on Oct 31, 2026.

Offers current as of Nov 1, 2026.

Offer code: 001155GSVML01XXPNRECGXCO21709260

Similar offers