Skip to content
Sel

Eva

Estimated bill

≈ €154.47 / month

Taxes included

Supplier share: €75.22/month, before taxes

Taxes included

Supplier share: €75.22/month, before taxes

€1,853.63 / year

At 1,400 Smc/year

≈ 0.5762 €/Smc using average PSV 0.5012

Markup on the market price

Market +0.075€/Smc

Standing charge

€96.00/ year (€8.00 / month)

Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use a shared PSV reference of 0.501205 €/Smc (12-month average, 2025-10/2026-09), which may differ from the contract’s index. Monthly spending is the annual estimate divided by 12, not a winter bill.

Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.

Availability & signup

  • Available only in selected areas. Confirm your supply address with the seller.

  • Areas listed by the seller: Trentino Alto Adige.

  • Check which residence requirements apply with the seller.

  • Check whether your activation or supplier change is eligible.

  • Annual consumption: 0–50,000 Smc. Confirm the applicable limits.

  • Confirm local availability, eligibility and activation terms with the seller.

Payment: Bank direct debit, Postal direct debit, Other methods

Signup channel: All channels

Sign up by Sep 30, 2027; this is not the price expiry date.

Offer terms

The Eva offer is a flexible indexed tariff that includes the capture and storage of emissions resulting from gas supply through investments in forest protection projects. The gas price is composed of the day-ahead PSV to which a spread and a fixed fee are added.

  • For more information on how to submit a complaint and on the forms, visit the following link: https://sel-bz.it/it/reclami-e-servizio-di-conciliazione/ ##### For information on submitting a complaint and on the forms, visit the following link: https://sel-bz.it/beschwerden-und-schlichtungsdienst/

  • Possibility to exercise the right of withdrawal, without fees and justification, within 14 days starting from the date of conclusion of the Contract. Possibility to request early contract execution before the end of the withdrawal period. Possibility to request early contract performance before the expiry of the right of withdrawal.

  • Withdrawal to terminate the supply must be communicated by registered mail or certified email (PEC), with a 1-month notice.

  • Completion of the specific form for the service request and possibly a Distributor quote request for carrying out connection works. The timescales and costs of activation (or other service) are those established by regulations and/or by the Distributor.

  • Billed consumption will be based on the following hierarchy: actual readings provided by the distributor; estimated readings made available by the Distributor; customer self-readings if validated; the best estimates made by SEL. Customer self-readings, if confirmed by the distributor;

  • In case of late payments, default interest will be applied, calculated on an annual basis, equal to the Official Reference Rate set by the European Central Bank increased by 3,5 percentage points. For further details on default and suspension procedures, please refer to the following link https://sel-bz.it/it/costituzione-in-mora-gas/.

Security deposit calculated based on annual consumption. No deposit is required for payment by SEPA and consumption below 5.000 smc/year. A deposit may be requested if the customer is in arrears with SEL. If the deposit is drawn on during the supply period, it must be replenished in whole or in part. Any deposit will be refunded when the contract ends. ##### Security deposit calculated based on annual consumption. For payment by SEPA and annual consumption below 5.000 smc/year, no security deposit is required. The deposit may be retained in the event of late payment. If the deposit is retained during the supply period, it must be replenished in whole or in part. Any remaining deposit will be refunded when the contract ends.

Annual seller charges

€96.00 / year

SEL applies a fixed component to remunerate its additional procurement activities in the free market. / SEL applies a fixed charge as remuneration for its procurement activity in the free market.

Discount conditions

Check each discount’s conditions. Do not deduct it again if it is already included in a price; discounts may not combine.

Bill discount, subject to conditions: €12.00 / year. SEPA + DIGITAL Discount

  • Discount of €1/month if the Customer opts for digital billing and automatic payment by SEPA direct debit. ##### Discount of €1/month if the customer opts for a digital bill and activates a standing order - SEPA.

Source & dates

Source accessed on Oct 31, 2026.

Offers current as of Nov 1, 2026.

Offer code: 001140GSVML01XXEVA25DOMPSVSELGAS

Similar offers

  • Estimated bill

    ≈ €166.24 / month

    Taxes included

  • Estimated bill

    ≈ €302.33 / month

    Taxes included