
Iren Smart No Stress Luce
Estimated bill
≈ €81.21 / month
Taxes included
Supplier share: €53.39/month, before taxes
Terms valid for 24 months
€974.55 / year
At 2,700 kWh/year
Part of the price per unit
Same price 24/7
Standing charge
Amount shown on the bill as “CCOM component,” set at €159 per POD/year
Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use the 12-month average of PUN (0.137499 €/kWh, 2025-10/2026-09). Monthly spending is the annual estimate divided by 12.
Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.
Availability & signup
Check availability at your supply address.
Check whether your activation or supplier change is eligible.
Confirm local availability, eligibility and activation terms with the seller.
Payment: Bank direct debit, Postal direct debit
Signup channel: All channels
Sign up by Nov 15, 2026; this is not the price expiry date.
Offer terms
Full offer text
Choose our new Iren No Stress electricity offer, a clear and transparent offer tailored to you. With a fixed instalment based on your consumption, you can enjoy the peace of mind of knowing exactly how much you will pay each month, with no surprises. For the first 12 months, the fixed instalment will be set when you sign the contract using your supply details and the annual consumption shown on a recent bill. This will help you plan your expenses and avoid seasonal price fluctuations. Your 12th-month bill will show the recalculation of the new fixed instalment, which will apply from month 13 to month 23. The new fixed instalment will be recalculated by considering the difference between the fixed instalments for the first 12 months and the amounts billed based on your actual consumption. In other words, you pay only for what you consume: if your consumption in the first 12 months is lower than estimated, your instalment will go down. Conversely, if your actual consumption exceeds the estimates, your new instalment for the second year will be adjusted proportionally to cover the additional consumption.
For a switch-in (change of supplier), supply will be activated within 3 months of the contract’s conclusion. For other supply requests (for example, takeover, transfer of the contract, or activation), the timelines for concluding the contract are set out in Article 2 of the General Supply Conditions. Any charges the Supplier applies for activating the contract are detailed in Article 20 of the General Supply Conditions and in the Economic Conditions. In all cases, the time needed for the Distributor’s activities and the billing of any charges set by the Distributor are additional.
This offer requires payment by bank direct debit and enrollment in the Bolletta Facile service. Iren Mercato will send an email to the email address provided whenever a bill is issued to the Customer. Bills can be viewed and printed using the IrenYou application (also accessible from mobile devices at https://clienti.irenlucegas.it).
Source & dates
Source accessed on Oct 31, 2026.
Offers current as of Nov 2, 2026.
Offer code: 000208ESFML08XX00IEDOFLATS261115
Similar offers
E3 Energy Power & Gas
Fix Casa Sicura New
Estimated bill
≈ €80.91 / month
Taxes included

Sunrise Energia
CasaFixCap2512med
Estimated bill
≈ €81.55 / month
Taxes included

Sunrise Energia
CasaFixCap2603med
Estimated bill
≈ €81.55 / month
Taxes included
E3 Energy Power & Gas
Fix Domestico Facile New
Estimated bill
≈ €81.70 / month
Taxes included
Estimated bill
≈ €78.98 / month
Taxes included
Estimated bill
≈ €78.66 / month
Taxes included