
Acea Energia Sprint
Incomplete estimate
We only know part of the supplier's unit price, so a precise total would be misleading. Check the full formula with the supplier.
Incomplete estimate
We only know part of the supplier's unit price, so a precise total would be misleading. Check the full formula with the supplier.
Part of the price per unit
Three rates
Standing charge
Only part of the price per unit is shown. Check the full pricing formula with the seller.
When do the time bands apply?
F1: Monday–Friday, 08:00–19:00, excluding national holidays.
F2: Monday–Friday, 07:00–08:00 and 19:00–23:00; Saturday, 07:00–23:00. National holidays excluded.
F3: Monday–Saturday, 23:00–07:00; all day on Sundays and national holidays.
ARERA time bandsEstimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.
Availability & signup
Check availability at your supply address.
Check which residence requirements apply with the seller.
Check whether your activation or supplier change is eligible.
Confirm local availability, eligibility and activation terms with the seller.
Payment: Bank direct debit, Postal direct debit, Pre-filled payment slip, Other methods
Signup channel: Other channels
Sign up by Dec 6, 2026; this is not the price expiry date.
Terms valid for 12 months
Offer terms
Acea Energia's indexed offer in the free market. For the entire term of these Economic Conditions, the electricity supplied by Acea Energia to cover all of the Customer's consumption will be certified, through European Guarantees of Origin, as having been fed into the grid and produced by plants powered entirely by renewable sources, in accordance with ARERA Resolution ARG/elt 104/11. This does not mean that the electricity consumed by the Customer comes directly from a renewable electricity generation plant. It means that Acea Energia will purchase and cancel a quantity of Guarantees of Origin sufficient to certify that electricity produced from renewable sources has been fed into the grid in an amount corresponding to the Customer's annual consumption. Find out more at www.aceaenergia.it/sostenibile
If, after the request to activate the electricity transmission and distribution service, the relevant distributor reports a type of use different from the one declared by the customer when accepting this offer, the distributor’s notification will prevail. The Energy Component will therefore be billed at the price and for the duration stated in the offer’s Economic Terms (section “Notes”). The remaining components, relating to transmission, distribution, metering and dispatching services, network losses, system charges and surcharges, and taxes will be billed for the twelve (12) months of supply according to the type of use declared by the distributor. In addition, if such discrepancies occur, no discount, bonus and/or benefit provided for in the offer, if any, will be granted.
The contract is for an indefinite term and you may withdraw from it at any time. If you withdraw from the contract to switch supplier, the new supplier will send the withdrawal notice directly by the 10th of the month before the supplier switch date. If instead you intend to end the supply and have the withdrawal/delivery point deactivated, you must give one month’s notice of your intention to exercise the right to withdraw from the contract by visiting www.aceaenergia.it, going to the MyAcea Energia reserved area > supplies > details > withdrawal/cancellation, and completing the relevant web form. If you have both electricity and natural gas supply, withdrawal from one supply will not also terminate the other active supply.
The charges covering the costs incurred by Acea Energia for the energy supply and set out in the Economic Conditions are valid for 12 months from the supply start date. The subsequent period is governed by the “General Conditions” document.
Annual seller charges
€120 / year
single charge in euro/year set by the seller
Source & dates
Source accessed on Oct 31, 2026.
Offers current as of Nov 1, 2026.
Offer code: 000774ESVFL01XXRT4D4028480000000
Similar offers

Acea Energia
Sprint
Estimated bill
—
Taxes included

Acea Energia
PLACET Variabile Luce Domestico
Estimated bill
≈ €79.61 / month
Taxes included

Acea Energia
PLACET Fissa Luce Domestico · Two rates
Estimated bill
≈ €101.01 / month
Taxes included

Acea Energia
PLACET Fissa Luce Domestico · Single rate
Estimated bill
≈ €101.02 / month
Taxes included