---
title: "Luce Facile Zero Spread - 1A – Metano Nord | 123offerte"
description: "Luce Facile Zero Spread - 1A from Metano Nord: estimated cost €73.80/month, variable price. Compare costs, terms and alternatives on 123offerte."
canonical_url: "https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-zero-spread-1a-eeaffdec"
locale: en
meta:
  "og:description": "Luce Facile Zero Spread - 1A from Metano Nord: estimated cost €73.80/month, variable price. Compare costs, terms and alternatives on 123offerte."
  "og:image": "https://123offerte.it/share/en/hero.png"
  "og:image:alt": "123offerte: illustration of 123offerte"
  "og:image:height": "630"
  "og:image:type": image/png
  "og:image:width": "1200"
  "og:title": "Luce Facile Zero Spread - 1A – Metano Nord"
  "twitter:description": "Luce Facile Zero Spread - 1A from Metano Nord: estimated cost €73.80/month, variable price. Compare costs, terms and alternatives on 123offerte."
  "twitter:image": "https://123offerte.it/share/en/hero.png"
  "twitter:image:alt": "123offerte: illustration of 123offerte"
  "twitter:title": "Luce Facile Zero Spread - 1A – Metano Nord"
---

> Index of every page on this site: [llms.txt](https://123offerte.it/llms.txt)

[Metano Nord](https://123offerte.it/en/energy/providers/metano-nord)

# Luce Facile Zero Spread - 1A

Estimated bill

**≈ €73.80 **/ month

Taxes included

Supplier share: €46.65/month, before taxes

**€885.58 / year**

At 2,700 kWh/year

≈ 0.154 €/kWh using average PUN 0.1375

Markup on the market price

**PUN +****0.0165**€/kWh

Three rates

Standing charge

**€144**/ year (€12.00 / month)

The CGC charge, which covers customer management activities, also includes the amount due for the DISPBT component, as required by ARERA, to cover the revenue associated with the mechanisms referred to in Articles 18, 19, 20 and

#### **When do the time bands apply?**

F1: Monday–Friday, 08:00–19:00, excluding national holidays.

F2: Monday–Friday, 07:00–08:00 and 19:00–23:00; Saturday, 07:00–23:00. National holidays excluded.

F3: Monday–Saturday, 23:00–07:00; all day on Sundays and national holidays.

[ARERA time bands](https://www.arera.it/en/bolletta/glossario-dei-termini/dettaglio/fasce-orarie)

Annual usage × unit price + supplier standing charge + network charges, levies and taxes. For variable offers we use the 12-month average of PUN (0.137499 €/kWh, 2025-10/2026-09). Monthly spending is the annual estimate divided by 12.

Estimates include network charges, system levies, excise and VAT. Supplier unit prices and standing charges are shown before these additions.

### **Availability & signup**

- Check availability at your supply address.
- Check whether your activation or supplier change is eligible.
- Confirm local availability, eligibility and activation terms with the seller.

Payment: Bank direct debit, Card direct debit, Postal direct debit, Pre-filled payment slip, Other methods

Signup channel: Sales outlet

Sign up by Nov 30, 2026; this is not the price expiry date.

### **Offer terms**

#### **Full offer text**

For customers with an electricity supply point (POD) for household use.

- The economic conditions are valid for 12 months from the date supply is activated. The Customer will receive written notice of the new commercial offer and its applicable period 3 (three) months before the Particular Supply Conditions expire. If no such notice is sent, these economic conditions will be extended until the Supplier gives different notice, always with at least 3 (three) months’ notice. The Customer retains the right to withdraw under the General Supply Conditions.
- For customers with an electricity supply point (POD) for household use.
- Bills must be paid within 20 days of their issue date, by postal payment slip or bank direct debit. Bills may be paid in installments in the cases and according to the procedures set out in the General Supply Conditions (CGF).
- Bills are issued every two months. The supplier's primary delivery method is electronic, unless the customer indicates otherwise. Paper bills are available at no charge to the customer.

If bank direct debit is not chosen or ceases to be the payment method, the Customer must pay a security deposit of €11.50 per kW of contractually committed capacity, charged on the first bill after the contract is signed. The Customer must also pay €23 for each request submitted to the Distributor on the Customer’s behalf (e.g. activation, change of account holder, or change of capacity). Customers already supplied by the Seller who have not changed their economic terms in the past 12 months may subscribe to this offer by paying €23.

### **Source & dates**

Source accessed on Oct 31, 2026.

Offers current as of Nov 2, 2026.

Offer code: 000394ESVFL01XX0000000CDNN1Z2M26

## Similar offers

- **Metano Nord** · [Luce Facile Zero Spread - 1A](https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-zero-spread-1a-94b1e1eb)

  Estimated bill

  **≈ €73.80** / month

  Taxes included
- **Metano Nord** · [Luce Facile - 1](https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-1-9aa467b0)

  Estimated bill

  **≈ €73.70** / month

  Taxes included
- **Estenergy** · [PiuControllo Active Casa Luce\_Caso A](https://123offerte.it/en/energy/electricity/estenergy/piucontrollo-active-casa-luce-caso-a-b873e13d)

  Estimated bill

  **≈ €74.01** / month

  Taxes included
- **Metamer** · [Luce Casa Extra Fidelity](https://123offerte.it/en/energy/electricity/metamer/luce-casa-extra-fidelity-4a941075)

  Estimated bill

  **≈ €73.80** / month

  Taxes included
- **Salerno Energia Vendite** · [Sev Bonus 60 Luce](https://123offerte.it/en/energy/electricity/salerno-energia-vendite/sev-bonus-60-luce-a1d30e88)

  Estimated bill

  **≈ €73.80** / month

  Taxes included
- **Nova AEG** · [Dinamica Luce](https://123offerte.it/en/energy/electricity/nova-aeg/dinamica-luce-6b8a54f2)

  Estimated bill

  **≈ €73.92** / month

  Taxes included

```json
{"@context":"https://schema.org","@graph":[{"@type":"Organization","@id":"https://123offerte.it/#organization","name":"123offerte","url":"https://123offerte.it/","logo":"https://123offerte.it/icon-512.png"},{"@type":"WebSite","@id":"https://123offerte.it/#website","name":"123offerte","url":"https://123offerte.it/","inLanguage":["it-IT","en"],"publisher":{"@id":"https://123offerte.it/#organization"}}]}
```

```json
{"@context":"https://schema.org","@type":"Service","name":"Luce Facile Zero Spread - 1A","provider":{"@type":"Organization","name":"Metano Nord"},"url":"https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-zero-spread-1a-eeaffdec","offers":{"@type":"Offer","priceCurrency":"EUR","price":73.8,"priceSpecification":{"@type":"UnitPriceSpecification","price":73.8,"priceCurrency":"EUR","unitText":"MON"}}}
```

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://123offerte.it/en"},{"@type":"ListItem","position":2,"name":"Electricity offers","item":"https://123offerte.it/en/energy/electricity"},{"@type":"ListItem","position":3,"name":"Metano Nord","item":"https://123offerte.it/en/energy/providers/metano-nord"},{"@type":"ListItem","position":4,"name":"Luce Facile Zero Spread - 1A – Metano Nord","item":"https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-zero-spread-1a-eeaffdec"}]}
```

Source: 123offerte.it — https://123offerte.it/en/energy/electricity/metano-nord/luce-facile-zero-spread-1a-eeaffdec (accessed 2026-11-02)

## Sitemap

See the full [sitemap](https://123offerte.it/sitemap.md) for all pages.
